From City Manager's Weekly Report:
Aliso Creek Bridge Painting -- Caltrans will begin painting the bridge over Coast Highway at Aliso Creek beginning Monday, May 4th. The work is expected to take two weeks during with time there will be various lane closures. In order to expedite the work and to allow the shorthanded Caltrans crews get this work done before the summer, City crews will be assisting with the traffic control.
Caltrans is short handed? Now there's a flash. And it will take TWO weeks. I can hire an out-of-work painter and he or she can probably do it in two days. No wonder this state is in the mess it is. Maybe the politians should do the painting. No it needs to be done by summer. Can you imagine 100 politians getting anything done -- ever? And who would be in charge? In charge? In charge? Forget it. Just drive up the canyon and hire two day-laborers. Then point them at the bridge and watch efficiency at work.
Does anyone know why this thing got built in the first place? It only serves about a dozen homes. Weird. Must be politics and money, mix well and serve.
Water Temp: 60
Tides:
12:54 AM 1.07 feet Low Tide
05:59 AM Sunrise
06:37 AM 4.16 feet High Tide
12:48 PM 0.30 feet Low Tide
07:18 PM 5.16 feet High Tide
07:37 PM Sunset